# Solar installation exceptions: keep a failed visit actionable

> What should operations record when an installation cannot be completed? Practical steps, an illustrative example and source-backed limitations for Australian solar teams.

Canonical: https://www.arcsolar.com.au/resources/solar-installation-exception-checklist  
Last updated: 2026-09-13

Practical checklists · By Argonix Digital · Published 2026-09-13 · Updated 2026-09-13

**Key point:** What should operations record when an installation cannot be completed? Start with the source record, then verify the next action.

## Prepare the right inputs

Open the correct work order and verify the customer, site, scope, installer and planned date. Record the actual blocker and evidence before changing the outcome.

Sources: [ArcSolar: field operations](https://docs.arcsolar.com.au/delivery/field-operations); [ArcSolar: projects](https://docs.arcsolar.com.au/delivery/projects)

## A practical example

- Illustrative visit: required materials are missing. Record what is missing, assign an owner to resolve it and arrange the next action through the available work-order controls.
- Keep installation, inspection, grid/metering and rebate progress distinct. A completed physical installation can still have outstanding documents or downstream work.

## Keep these boundaries clear

Do not mark the whole job complete to clear a queue. A note or AI summary cannot certify site safety, installer accreditation or compliance. Use the responsible qualified parties for those decisions.

Sources: [ArcSolar: field operations](https://docs.arcsolar.com.au/delivery/field-operations); [ArcSolar: projects](https://docs.arcsolar.com.au/delivery/projects)

## Put the checklist to work

Use one representative record to test the workflow before rolling it out across the team. Confirm what is supported in your plan and who owns unresolved work.

- [Explore the related ArcSolar workflow](https://www.arcsolar.com.au/solutions/solar-operations-software)

## Sources

- [ArcSolar: field operations](https://docs.arcsolar.com.au/delivery/field-operations) (ArcSolar Documentation, checked 2026-09-13)
- [ArcSolar: projects](https://docs.arcsolar.com.au/delivery/projects) (ArcSolar Documentation, checked 2026-09-13)

## Related

- [Solar and electrification warranty claims: keep the handover connected](https://www.arcsolar.com.au/resources/solar-electrification-warranty-handover)
- [Victorian Solar Homes quote checks: seller identity and approval](https://www.arcsolar.com.au/resources/victoria-solar-homes-quote-checklist)
- [Solar quote follow-up: SMS templates for the customer’s actual stage](https://www.arcsolar.com.au/resources/solar-quote-sms-templates)