# Solar lead assignment: ownership that survives handover

> How should a solar team assign leads without losing accountability? Practical steps, an illustrative example and source-backed limitations for Australian solar teams.

Canonical: https://www.arcsolar.com.au/resources/solar-lead-assignment-checklist  
Last updated: 2026-09-13

Practical checklists · By Argonix Digital · Published 2026-09-13 · Updated 2026-09-13

**Key point:** How should a solar team assign leads without losing accountability? Start with the source record, then verify the next action.

## Prepare the right inputs

Search for the existing customer, confirm the work being assigned and choose the appropriate owner. Lead ownership and opportunity ownership can represent different responsibilities; a mention or tag is not reassignment.

Sources: [ArcSolar: records](https://docs.arcsolar.com.au/customers/records); [ArcSolar: team](https://docs.arcsolar.com.au/setup/team)

## A practical example

- Illustrative handover: a rep leaves the business with an open quote and two follow-up tasks. Review customer ownership, opportunity ownership and each task before access changes.
- Reopen the record after saving to confirm the intended owner and visibility. Give the receiving rep the last customer commitment and next action, not just a name in a dropdown.

## Keep these boundaries clear

This guide does not claim automatic round-robin routing or a particular assignment algorithm. Use the controls and permissions actually available in the workspace and verify each saved change.

Sources: [ArcSolar: records](https://docs.arcsolar.com.au/customers/records); [ArcSolar: team](https://docs.arcsolar.com.au/setup/team)

## Put the checklist to work

Use one representative record to test the workflow before rolling it out across the team. Confirm what is supported in your plan and who owns unresolved work.

- [Explore the related ArcSolar workflow](https://www.arcsolar.com.au/solutions/solar-lead-management-software)

## Sources

- [ArcSolar: records](https://docs.arcsolar.com.au/customers/records) (ArcSolar Documentation, checked 2026-09-13)
- [ArcSolar: team](https://docs.arcsolar.com.au/setup/team) (ArcSolar Documentation, checked 2026-09-13)

## Related

- [Solar and electrification warranty claims: keep the handover connected](https://www.arcsolar.com.au/resources/solar-electrification-warranty-handover)
- [Victorian Solar Homes quote checks: seller identity and approval](https://www.arcsolar.com.au/resources/victoria-solar-homes-quote-checklist)
- [Solar quote follow-up: SMS templates for the customer’s actual stage](https://www.arcsolar.com.au/resources/solar-quote-sms-templates)
