# Solar proposal checklist: make every quote clear | ArcSolar

> Use a simple solar proposal checklist, then see how ArcSolar connects the quote, customer payment and installation handover.

Canonical: https://www.arcsolar.com.au/resources/solar-quote-quality-checklist  
Last updated: 2026-09-27

Proposals · By Argonix Digital · Published 2026-09-12 · Updated 2026-09-27

**Key point:** Show what is included, flag what needs checking and keep the accepted version with the job.

[Download the proposal assumptions ledger (CSV)](https://www.arcsolar.com.au/downloads/solar-proposal-assumptions.csv)

## Answer the customer’s five questions

- What equipment am I getting?
- What is included in the price?
- Which savings assumptions are being used?
- What do I pay, and when?
- What still needs checking before installation?

## Start with the right information

Gather the bill, site photos and equipment list. ArcSolar offers AI bill analysis, a savings estimator and Roof Vision roof design. Check the extracted values and proposed layout before sending the quote.

Sources: [AI electricity bill assessment](https://docs.arcsolar.com.au/quoting/bill-analysis); [Savings estimator](https://docs.arcsolar.com.au/quoting/savings); [Roof Vision and roof design](https://docs.arcsolar.com.au/quoting/roof-design)

## Before you send

| Check | Make it clear |
| --- | --- |
| System | Models, quantities and installation address |
| Price | Total, exclusions, expiry and payment steps |
| Savings | Usage, tariffs and assumptions |
| Site | Missing photos or unresolved conditions |
| Handover | Accepted version and the next owner |

## Example: a missing switchboard photo

Illustrative example: Quote Q-104 v1 is ready, but the switchboard photo is unreadable. Keep that item open and request a new photo. If the review changes the scope, issue v2 and explain the difference. Operations should receive the accepted version—not guess from the latest draft.

## Keep the checks that matter

Site suitability needs qualified review. Savings are estimates. Recheck incentives for the actual system and installation date. A deposit does not resolve an unanswered site question.

## See the whole offer in ArcSolar

Book a demo and follow a quote from customer review through payment and handover. We’ll show how your team can keep the offer and the next action together.

- [Compare solar software by workflow](https://www.arcsolar.com.au/compare/solar-software-australia)
- [Check installation readiness](https://www.arcsolar.com.au/resources/solar-installation-readiness-checklist)

Sources: [ArcSolar proposals](https://www.arcsolar.com.au/solutions/solar-proposal-software); [ArcSolar customer payments](https://www.arcsolar.com.au/solutions/solar-payment-software)

## Sources

- [ArcSolar proposals](https://www.arcsolar.com.au/solutions/solar-proposal-software) (ArcSolar, checked 2026-09-12)
- [ArcSolar customer payments](https://www.arcsolar.com.au/solutions/solar-payment-software) (ArcSolar, checked 2026-09-12)
- [AI electricity bill assessment](https://docs.arcsolar.com.au/quoting/bill-analysis) (ArcSolar, checked 2026-09-12)
- [Savings estimator](https://docs.arcsolar.com.au/quoting/savings) (ArcSolar, checked 2026-09-12)
- [Roof Vision and roof design](https://docs.arcsolar.com.au/quoting/roof-design) (ArcSolar, checked 2026-09-12)
