ArcSolar field guide / Industry updates

Mid-scale solar STCs: what retailers should prepare now

The expanded SRES applies to eligible mid-scale solar installed from 1 October 2026. Applications are expected to open in mid-to-late November. Keep those dates separate when preparing a commercial offer: installation eligibility does not mean a claim can be submitted or paid today.

Book a demo

Bring one commercial job to an ArcSolar demo. Confirm the workflow and specialist scope your project needs.

By Argonix Digital · Published · Updated

Which systems does the change cover?

CER’s transitional guidance defines mid-scale eligibility as greater than 100kW and up to 1MW, subject to the other requirements. Eligible systems use a fixed five-year deeming period. CER also describes an STC/REGO choice; choosing STCs prevents REGO creation during that deeming period.

Sources: [1][2][3]

Prepare an evidence handover

  • Confirm the system boundary and existing or related generation before choosing a certificate route.
  • Retain applicable planning/building and network approvals, design and metering records, and the electrical compliance certificate.
  • Record testing and commissioning. CER uses when the system first becomes capable of producing and delivering electricity, rather than the procurement date.
  • Give the installer and registered agent clear ownership of serial-number and photographic evidence.

Sources: [3]

Example: an October commissioning date

Illustrative example: a 150kW project is planned for commissioning on 20 October. The team checks eligibility, retains approvals and records the actual commissioning evidence. The offer explains that applications are expected later in November; neither the planned install date nor a prepared evidence pack proves approval or payment.

Example: an October commissioning date
MilestoneWhat to record
CommissioningActual date and compliance evidence
Application openingCurrent CER process and outstanding requirements
SettlementConfirmed financial evidence

Check extensions and scheme interactions

Related systems, upgrades and existing accredited power stations need a specific eligibility assessment. Use CER’s current transitional guidance and your agent’s advice. This guide does not calculate certificate value or establish ArcSolar support for a 1MW design or mid-scale claim submission; confirm those requirements separately.

Sources: [3]

Agree the next action before handover

Use an ArcSolar demo to follow the customer, quoted scope and installer handover together. Bring the commercial connection and claim requirements so the team can confirm your setup.

Sources: [4]

Sources and review (4)

Published by ArcSolar. Examples are illustrative; product details come from the sources below. Editorial standards.

Bring your workflow

Keep commercial quote and handover decisions connected

Book a demo