Prepare the right inputs
Open the correct work order and verify the customer, site, scope, installer and planned date. Record the actual blocker and evidence before changing the outcome.
A practical example
- Illustrative visit: required materials are missing. Record what is missing, assign an owner to resolve it and arrange the next action through the available work-order controls.
- Keep installation, inspection, grid/metering and rebate progress distinct. A completed physical installation can still have outstanding documents or downstream work.
Keep these boundaries clear
Do not mark the whole job complete to clear a queue. A note or AI summary cannot certify site safety, installer accreditation or compliance. Use the responsible qualified parties for those decisions.
Put the checklist to work
Use one representative record to test the workflow before rolling it out across the team. Confirm what is supported in your plan and who owns unresolved work.
Sources and review (2)
Published by ArcSolar. Examples are illustrative; product details come from the sources below. Editorial standards.
- ArcSolar: field operations — ArcSolar Documentation; checked 13 September 2026.
- ArcSolar: projects — ArcSolar Documentation; checked 13 September 2026.